Pre-Commissioning Testing
Pre-Commissioning Testing is a critical step in ensuring that all electrical systems and equipment are installed correctly, function as intended, and are ready for safe commissioning. This phase involves detailed inspections, functional testing, and verification to detect any issues before energizing the system.

- Insulation resistance testing for cables, motors, and transformers
- Continuity and polarity checks
- Loop checking of control circuits
- Primary and secondary injection testing of protection relays
- Functional testing of switchgear, breakers, and control panels
- Verification of grounding systems and earthing continuity
- Voltage withstand (HiPot) testing for high-voltage equipment
- Transformer ratio, vector group, and winding resistance testing
- Testing of CTs and PTs for accuracy and polarity
- Relay logic and interlock verification